
Role / Client
M&E Designer / M&E Contractor
Duration
Sept 2020 – Sept 2021
Construction Value
4,000,000
M&E Value
950,000
Location
Brighton, England
Project Works
- Production of M&E designs to the equivalent of Stage 4.
- Full mechanical design: LTHW; water services; drainage; ventilation.
- Full electrical design: LV distribution; small power; lighting; fire alarm.
- To ensure accuracy a full thermal model was produced.
- Coordination was key to ensure heights within a basement car park.